Hydrobike
by Corey Malczewski

1. Float Assembly
1.1. Carrying Strap Assembly
1.1.1. 2 Bolts
1.1.2. 4 Metal Washers
1.1.3. Strap
1.2. Alum Plug
1.3. Pontoon
1.3.1. 4 Brass Inserts
1.3.2. 1 Alum Inset
1.3.3. 2 Frame Bolts
1.3.4. 2 Knobs
1.4. Tape 1" [Optional]
1.5. Carrying Strap Assembly
1.5.1. 2 Bolts
1.5.2. 4 Metal Washers
1.5.3. Strap
2. Float Assembly
2.1. Carrying Strap Assembly
2.1.1. 2 Bolts
2.1.2. 4 Metal Washers
2.1.3. Strap
2.2. Alum Plug
2.3. Pontoon
2.3.1. 4 Brass Inserts
2.3.2. 1 Alum Inset
2.3.3. 2 Frame Bolts
2.3.4. 2 Knobs
2.4. Tape 1" [Optional]
2.5. Carrying Strap Assembly
2.5.1. 2 Bolts
2.5.2. 4 Metal Washers
2.5.3. Strap
3. Console Assembly
3.1. Bolt Bag
3.1.1. 2 Frame Bolts
3.1.2. 4 Washers Rubber
3.1.3. 2 Wing Nuts
3.2. Hinge
3.3. Poly Lid
3.4. Poly Console
3.4.1. 4 Brass Inserts